ProjectLine Technical Services Inc.

2900 Bristol, Ste D-103
Costa Mesa, Ca 92626

Phone: (714) 540-5460


Contact Us

Investigative Engineering Services, various clients.

Investigative Engineering Services, various clients

ProjectLine provided forensic and investigative engineering services for various confidential clients. Recent projects include investigation of PVC pipe failures at a water treatment plant, and expert witness role in $2.5 million construction claim case. The case resulted from multiple catastrophic…

City of Ontario – Site Security Upgrades Project

City of Ontario – Site Security Upgrades Project

ProjectLine provided desigsn-phase and construction management for upgrades to security systems at City reservoirs 1, 2, 3, 7, 8, 9 and 10. Upgrades included vandal-resistant, visually attractive electric sliding gates, fences, and Supervisory Control and Data Acquisition (SCADA) equipment enclosures.…

LADWP - Owens Lake Dust Mitigation Controls Project

LADWP – Owens Lake Dust Mitigation Controls Project

Owens Lake’s ponds, lateral shallow flood, and managed vegetation require water for dust mitigation in compliance with environmental mitigation agreements. The Lake’s water use fluctuates throughout the day due to automated schedules that run over 150 shallow flood laterals and…

City of Los Angeles, Albion Riverside Park

City of Los Angeles, Albion Riverside Park

ProjectLine provided electrical design for site improvements on this Proposition O project as a subconsultant to Tetra Tech. The Institute for Sustainable Infrastructure (ISI) named the project as recipient of the 2020 Envision® Gold award for sustainable infrastructure for delivering…

ProjectLine Technical Services

Farmersville Wastewater Treatment Plant Expansion and Upgrade

ProjectLine assisted with Electrical and Controls design for expansion to 1.4 mgd, including influent pumps, pretreatment, aeration basins, aeration blowers, secondary clarifiers, a digester, and gravity belt thickener. ProjectLine also provided SCADA design including HMI per ISA 101 standards and…

ProjectLine Technical Services

City of Los Angeles Aliso Creek – Limekiln Creek Restoration Project

ProjectLine provided electrical and controls designs for stormwater diversion and treatment as subconsultant to Tetra Tech. Aliso Creek is located within a 12,484-acre watershed that conveys upstream runoff from developed portions of the Northridge, Granada Hills, and Chatsworth down to…

ProjectLine Technical Services

Caltrans Stormwater Best Management Practices (BMP) Evaluations

ProjectLine prepared two reconnaissance studies for Caltrans stormwater management program, each of which included a literature review and study report. The first study evaluated alternatives for stormwater disinfection as a potential new Caltrans BMP. Disinfection alternatives evaluated included anti-microbial filters,…

ProjectLine Technical Services

Eagle Rock Reservoir Floating Cover Replacement, LADWP

ProjectLine provided electrical and instrumentation design for the floating cover design as a subconsultant to Arcadis. Design included powering 4 primary rainwater pumps, and 3 rainwater transfer pumps, with related instrumentation and controls. Design included innovative details for electrical connections…

ProjectLine Technical Services

MWD – Hayfield Groundwater Recovery Facility

To augment water supplies during dry years, Metropolitan Water District of Southern California decided to build a groundwater recovery facility in the Mojave Desert adjacent to the Colorado River Aqueduct and the Julian Hinds Pumping Plant. A submersible pump in…

ProjectLine Technical Services

OCSD – Edinger Pump Station Design

ProjectLine provided preliminary electrical and controls design for upgrade/replacement of OCSD’s Edinger Pump Station as subconsultant to LAN (Lockwood, Andrews and Newnam). Preliminary design studies included evaluation of the existing pump station equipment, and compliance with National Electric Code, and…

ProjectLine Technical Services

Preliminary Design of Stormwater Improvements, LADWP

ProjectLine evaluated four alternatives for re-routing existing storm drainage at LADWP’s Van Norman Complex to make room for construction of a new chlorine contact tank and related water treatment plant site upgrades. ProjectLine produced plans and profiles for the alternatives,…