ProjectLine Technical Services Inc.

2900 Bristol, Ste D-103
Costa Mesa, Ca 92626

Phone: (714) 540-5460


Contact Us

City of Los Angeles Aliso Creek – Limekiln Creek Restoration Project

ProjectLine provided electrical and controls designs for stormwater diversion and treatment as subconsultant to Tetra Tech. Aliso Creek is located within a 12,484-acre watershed that conveys upstream runoff from developed portions of the Northridge, Granada Hills, and Chatsworth down to the Los Angeles River. The Project included both water quality and park facility improvements, with vegetation and wildlife habitat restoration. Water quality benefits include an increase in infiltrated water and a reduction in TMDLs. The project included dry and up to 10 cfs of wet weather diversion. Diverted flows are conveyed to and pretreated with hydrodynamic separators and then pumped to bioretention basins for additional filtration.