ProjectLine provided electrical and instrumentation design services for the Venice Pump Station Dual Forcemain Project as a subconsultant to Tetra Tech. The project provided a second 54 inch forcemain from this critical pump station to improve reliability and allow the existing forcemain to be temporarily removed from service when maintenance was needed. Both the new 54” and existing 48” forcemain were provided with new electric operated isolation valves and magnetic flow meters installed in underground vaults. The valves and flow meters were monitored at the pump station PLC, at the local HMI and the utility wide Transdyne HMI. New motorized gates, and gate intercom were added for improved pump station security.
ProjectLine also provided electrical and controls engineering for a preliminary engineering study to evaluate feasibility and costs for a new auxiliary pump station that would add supplemental pumping capacity. ProjectLine was a subconsultant to Carollo Engineers for this project.