ProjectLine managed and prepared civil and mechanical designs for upgrades and maintenance of the City of Los Angeles’ wastewater treatment plants. ProjectLine staff managed upgrades to a variety of systems including:
- Emergency oil cooling system for Tillman and Glendale Plant blowers
- Odor control system upgrades and biofilter tests for Hyperion Plant
- Dewatering polymer system for Hyperion Plant Centrifuge Facility
- Oxygen diffusion system for Hyperion plant reactor modules
- Sodium bisulfite dosing system for Terminal Island Plant
- Final tanks upgrade for Terminal Island Plant
- Direct steam injection sludge heating system for Hyperion Plant
- Channel aeration system upgrade for DC Tillman Plant, Channel #2
- Sludge Emergency Storage System (digester modifications for sludge storage) for Hyperion Plant, Digester Battery B
- Grit and Screening Upgrade for Hyperion Plant Headworks