ProjectLine Technical Services Inc.

2900 Bristol, Ste D-103
Costa Mesa, Ca 92626

Phone: (714) 540-5460


Contact Us

Metropolitan Water District of Southern California (MWD) BESS Designs

ProjectLine provided Civil and Structural designs for Battery Energy Storage System (BESS) installations at MWD’s Skinner, Jensen and Weymouth water treatment plants. Designs included fire water piping for fire suppression systems, electrical ductbanks, site grading and paving, equipment pads, and noise barrier walls. ProjectLine was subconsultant to Stantec for the projects.